GD427 in action

GD427 in action

Sunday, 31 May 2009

... and a few more holes

Managed to grab a few hours this weekend to finish of a few little jobs I've been wanting to do. Firstly there were a few more holes which needed to be drilled, namely:-

One hole either side for the side repeaters (indicators)
Series of 5 holes for the heater inlet which sits behind the side vent on the nearside

Holes for the pipework to and from the brake and clutch master cylinders and resevoirs

These holes from left to right are for the wiring loom into the engine bay, hot water hoses from the engine bay into the heater on the other side of this panel and finally the battery studding. This consists of two 10mm studs bolted through the panel with the battery connected to them on the other side providing a power take off point into the engine bay.

And finally, the cut out for the footwell extension. I was a little nervous of making this cut and deliberately made the hole a bit small. Cutting the hole now will allow me to see from both sides when I fit the extension piece making it easier to make a final cut to the right size. I'll do a full write up under a seperate heading at a later date.

As well as this I have also now finished all the flashlines, both inside around the cockpit and all the way round the outside, aswell as underneath.... hooray !

No comments: